Skip navigation links
Main Page
Announcements
Institutional
Projects
Industrial Services
Turkish Defence Industry
Events
Türkçe
Arama : Go Search
Skip navigation links
Director (Quality)
Director (Test and Certification)
Director (Test and Certification) 
 

Director : Alper KÖSE


Purpose

  • To verify the products by taking into account functionality, reliability, maintainability, safety and availability performance factors,
  • To fulfill the requirements of the product in accordance with the Technical Specifications during the Contract Management phase,
  • To procure the product and to test, analyze, design, control, document, verify, identify the quality factors during the Implementation process of Contract Management,
  • To accomplish the “Certification” activities and to perform the “Test/Product–Service Acceptance Transactions”

Objectives

  • TO IMPLEMENT THE ACTIVITIES IN COMPLIANCE WITH THE TEST-ACCEPTANCE AND CERTIFICATION ACTIVITIES WHICH ARE BEING IMPLEMENTED IN NATO AND OTHER DEVELOPED COUNTRIES’ DEFENSE PROJECTS
  • TO CONSTITUTE A SUITABLE ORGANIZATION COMPLYING WITH THE INTERNATIONAL NORM AND STANDARDS THAT WOULD SATISFY THE AIRWORTHINESS AND CERTIFICATION REQUIREMENTS OF AIR VEHICLES IN TURKEY AND TO PERFORM RELATED ACTIVITIES FOR PILOT PROGRAMS.
  • TO MAINTAIN A SYSTEM RELATED TO TEST AND CERTIFICATION PROCESS WHICH COMPLIES WITH THE INTERNATIONAL NORM AND STANDARDS IN LOCAL COMPANIES-INSTUTIONS
  • TO DETERMINE THE CAPABILITIES OF THE COMPANIES/INSTITUTIONS IN TURKEY WHICH COULD PERFORM THE ENVIRONMENTAL CONDITIONS AND QUALIFICATION TESTS AND TO SET FORTH METHODS THAT DECREASES DEPENDENCY TO EXTERNAL FACTORS
  • TO OPTIMIZE THE PROJECT TEST/ACCEPTANCE ACTIVITIES IN ORDER TO ADJUST THE PRODUCT AND SERVICE ACCEPTANCE ACTIVITIES SUITABLE WITH THE PROCUREMENT MODEL

Activity Areas

  • Project Test Activities
    • TEST REQUIREMENTS MANAGEMENT(DEFINING AND DESIGNING THE TEST)
    • TEST PLANNNING
    • TEST IMPLEMENTATION
    • EVALUATING THE TEST RESULTS AND REPORTING

 

  • PRODUCT-SERVICE ACCEPTANCE ACTIVITIES
    • PRELIMINARY MEETING (Review of the test plan-program with SSM-User and Subcontractor)
    • PERFORMING THE TESTS [Compatible with Test and Evaluation Master Plan (TEMP)]
    • EVALUATION MEETING (Reviewing the test results with SSM- User and Subcontractor)
    • SIGNING OF THE PROTOCOL (In case of successful completion of the tests)
    • RELEASE OF PROTOCOL

 

SSM Bilgi Yönetimi Şube Müdürlüğü tarafından tasarlanmıştır - 2007